VI / EN
News - Vinh Hung JSC

News

Two metro trains designed for Ho Chi Minh City’s metro - Vinh Hung JSC

Japanese metro trains shipped for Ho Chi Minh City metro line No.1

05-05-2021 Two metro trains designed for Ho Chi Minh City’s metro line No.1 are due to leave Japan’s Kasado port on May 1 and arrive at a port in the Vietnamese city on May 9. Read more
Vinh Hung - Vietnam’s transport Enterprise - Vinh Hung JSC

Vietnam’s transport Enterprises: Shines forth in a special year with a series of dramatic changes

Investing in the development of transport infrastructure, raising the localization rate of imported substitutes, the application of technology in management, and production are the three key factors to help Vietnam’s transport enterprise to develop sustainably during the Covid period.
Read more 23/04/2021
Dự án Cebu-Cordova Link Expressway - Vinh Hung JSC

Cebu-Cordova Link Expressway project more than halfway through

This is the Cebu-Cordova Link Expressway (CCLEX), one of the biggest infrastructure projects ongoing in the Philippines. Vinh Hung JSC is honored to be manufacturer and supplier to provide 18km of handrails for this project.
Read more 23/04/2021
VINH HUNG IP FACTORY ACHIEVES ISO 3834 AND EN 1090 CERT - Vinh Hung JSC

VINH HUNG IP FACTORY ACHIEVES ISO 3834 AND EN 1090 CERTIFICATES

Vinh Hung IP is the first factory manufacturing mechanical products for the transport industry in Vietnam to achieve ISO 3834 and EN 1090 certification (Execution Class: EXC3).
Read more 03/04/2021
THANG LONG BRIDGE HAS BEEN OPEN TO TRAFFIC - Vinh Hung JSC

THIS MORNING, THANG LONG BRIDGE HAS BEEN OPEN TO TRAFFIC, 10 DAYS AHEAD OF SCHEDULE

Thang Long Bridge was officially opened this morning (7th January 2021) after 6 months of being repaired with great efforts and determination from the investor and contractors.
Read more 07/01/2021
MINISTER OF TRANSPORT INSPECTS TWO IMPORTANT PROJECTS - Vinh Hung JSC

MINISTER OF TRANSPORT INSPECTS TWO IMPORTANT PROJECTS IN THE CAPITAL

On the afternoon of 23rd December 2020, Minister Nguyen Van The suddenly inspected the project of repairing the Thang Long bridge surface and the project of upgrading the runway at Noi Bai Airport.
Read more 30/12/2020
WATER RESOURCES SOLUTIONS OF MACCAFERRI CORPORATE - Vinh Hung JSC

“GABION REVETMENT AND REINFORCED RETAINING WALLS SOLUTIONS FOR STEEP SLOPES - WATER RESOURCES SOLUTIONS OF MACCAFERRI CORPORATE (ITALY)” SEMINAR.

On 28th October 2020, The Southern Institute Of Water Resources Research associated with Vinh Hung Trading, Consulting and Construction JSC to organize the “Gabions revetment and reinforced retaining walls solutions for steep slopes - Water resources solutions of Maccaferri Corporate (Italy)” workshop.
Read more 10/12/2020
SPEED UP THE EXPANSION OF NATIONAL HIGHWAY 53 - Vinh Hung JSC

TAKE ADVANTAGE OF THE SUNNY WEATHER, SPEED UP THE EXPANSION OF NATIONAL HIGHWAY 53

Taking advantage of good sunny weather, contractors accelerate the expansion of National Highway 53, Tra Vinh - Long Toan section.
Read more 25/11/2020
VINH HUNG FOUNDATION DAY CELEBRATION “14 YEARS – SOLID - Vinh Hung JSC

VINH HUNG FOUNDATION DAY CELEBRATION “14 YEARS – SOLID CONNECTION”

Last Saturday on November 14, more than 100 Vinh Hung’s employees presented at Asean Resort to attend the program "14 years - Solid Connection". Let's look back at the image of full-of-energy and brilliant Vinh Hung in teambuilding activities and Gala Dinner.
Read more 18/11/2020