Along the Ha Long – Van Don Expressway, rapid variations in topography, geology, and hydrology, together with heavily dissected terrain and relatively steep slopes, have created diverse geological hazards such as landslides, slope failures, erosion, rockfalls, and rolling rocks (classified in accordance with TCVN 13346:2021). Therefore, multiple slope stabilization solutions were required throughout the project.

Within this project, Vinh Hung implemented slope stablization solutions using high-strength steel mesh systems combined with shear connectors. In addition, flexible rockfall barrier systems were installed at locations with high risks of rockfalls and flying rocks to ensure safety for road users and vehicles traveling through the area.

Ha Long – Van Don Expressway

Project information

Client
Client

Bien Cuong BOT JSC

Contractor(s)
Contractor(s)

ATV Vietnam JSC

Total Investment
Total Investment

Approximately VND 12 trillion

Vinh Hung Scope of Work
Vinh Hung Scope of Work

Supply and installation of solutions including high-strength steel mesh systems combined with shear connectors; flexible rockfall barriers; and sound-absorbing noise barriers.

Year
Year

2019 – 2020