Phan Thiet – Dau Giay Expressway
Phan Thiet – Dau Giay Expressway
Phan Thiet – Dau Giay Expressway
Phan Thiet – Dau Giay Expressway

Phan Thiet – Dau Giay Expressway

The Phan Thiet – Dau Giay Expressway is 99 km long, passing through Dong Nai and Binh Thuan provinces, and was inaugurated and opened to traffic on April 29, 2023.

Within this project, Vinh Hung implemented slope reinforcement solutions using high-strength steel mesh systems combined with shear connectors and polymer-based triaxial geogrids for surface erosion control.

Phan Thiet – Dau Giay Expressway

Project information

Client
Client

Thang Long Project Management Unit

Contractor(s)
Contractor(s)

Phuong Thanh JSC

Total Investment
Total Investment

More than VND 12.577 trillion

Vinh Hung Scope of Work
Vinh Hung Scope of Work
  • Supply of bridge bearings, expansion joints, prestressing cables, and prestressing anchorages.
  • Supply and installation of solutions including high-strength steel mesh systems combined with shear connectors, and polymer-based triaxial geogrids for surface erosion control.
Year
Year

2023

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.