Construction of the Connecting Road from National Highway 19 to Becamex VSIP Binh Dinh Industrial Park Linked to Quy Nhon Port
Construction of the Connecting Road from National Highway 19 to Becamex VSIP Binh Dinh Industrial Park Linked to Quy Nhon Port
Construction of the Connecting Road from National Highway 19 to Becamex VSIP Binh Dinh Industrial Park Linked to Quy Nhon Port
Construction of the Connecting Road from National Highway 19 to Becamex VSIP Binh Dinh Industrial Park Linked to Quy Nhon Port
Construction of the Connecting Road from National Highway 19 to Becamex VSIP Binh Dinh Industrial Park Linked to Quy Nhon Port
Construction of the Connecting Road from National Highway 19 to Becamex VSIP Binh Dinh Industrial Park Linked to Quy Nhon Port
Construction of the Connecting Road from National Highway 19 to Becamex VSIP Binh Dinh Industrial Park Linked to Quy Nhon Port
Construction of the Connecting Road from National Highway 19 to Becamex VSIP Binh Dinh Industrial Park Linked to Quy Nhon Port
Construction of the Connecting Road from National Highway 19 to Becamex VSIP Binh Dinh Industrial Park Linked to Quy Nhon Port

Construction of the Connecting Road from National Highway 19 to Becamex VSIP Binh Dinh Industrial Park Linked to Quy Nhon Port

The connecting road from National Highway 19 to Becamex VSIP Industrial Park linked to Quy Nhon Port has a total investment of nearly VND 1.2 trillion. Traversing forests and mountainous terrain, the project is considered a key infrastructure work marking the 50-year milestone of reconstruction and development in Binh Dinh Province after reunification. Within the project, Vinh Hung supplied and installed erosion control solutions using polymer-based triaxial double-twisted steel mesh systems, while also implementing slope reinforcement and rockfall protection solutions using high-strength steel mesh systems combined with shear connectors.

For erosion control, the polymer-based triaxial double-twisted steel mesh system was installed over the entire stabilized soil slope surface, reinforcing the surface, preventing erosion, and creating favorable conditions for vegetation growth and slope greening.

To ensure safety for road users and vehicles traveling along the route, the high-strength steel mesh system combined with shear connectors was implemented to enhance surface stability and prevent rockfalls. The system utilizes 32 mm diameter steel anchors drilled to an average depth of 5.1 m in accordance with design requirements. These anchors are fixed within stable geological layers and fully grouted with cement mortar having a minimum compressive strength equivalent to Grade C30.

Construction of the Connecting Road from National Highway 19 to Becamex VSIP Binh Dinh Industrial Park Linked to Quy Nhon Port

Project information

Client
Client

Binh Dinh Province Transport Project Management Board

Contractor(s)
Contractor(s)

Vinh Hung Trading, Consultancy and Construction JSC

Total Investment
Total Investment

VND 1.2 trillion

Vinh Hung Scope of Work
Vinh Hung Scope of Work

Supply and installation of solutions including high-strength steel mesh systems combined with shear connectors, and polymer-based triaxial geogrids for surface erosion control.

Year
Year

2023 – 2025