Lai Chau Connection Route – Northern Mountainous Provinces Transport Connectivity Project
Lai Chau Connection Route – Northern Mountainous Provinces Transport Connectivity Project
Lai Chau Connection Route – Northern Mountainous Provinces Transport Connectivity Project
Lai Chau Connection Route – Northern Mountainous Provinces Transport Connectivity Project
Lai Chau Connection Route – Northern Mountainous Provinces Transport Connectivity Project
Lai Chau Connection Route – Northern Mountainous Provinces Transport Connectivity Project

Lai Chau Connection Route – Northern Mountainous Provinces Transport Connectivity Project

The Northern mountainous region of Vietnam is frequently affected by natural disasters, particularly landslides and rockfalls of increasing severity, causing significant damage to both lives and property. Therefore, slope reinforcement and rockfall prevention measures have become essential to ensure the safety of local residents and road users in the region.

The Northern Mountainous Provinces Transport Connectivity Project, managed by the Ministry of Transport, has a total length of approximately 200 km crossing Lao Cai, Lai Chau, and Yen Bai provinces, with a total investment of VND 6.018 trillion and an implementation period from 2019 to 2024. The project consists of two routes: the connection from Lai Chau to the Hanoi – Lao Cai Expressway (147 km), and the connection from Nghia Lo (Yen Bai) to the Hanoi – Lao Cai Expressway (53 km). Vinh Hung’s contract package belongs to the Lai Chau connection route.

In 2023, Vinh Hung completed the construction of reinforced soil retaining walls with anchored gabion facing panels. In 2024, the company completed positive slope reinforcement and rockfall protection works using high-strength steel mesh systems combined with shear connectors along the Lai Chau connection route.

Lai Chau Connection Route – Northern Mountainous Provinces Transport Connectivity Project

Project information

Client
Client

Project Management Unit 2 – Ministry of Transport

Contractor(s)
Contractor(s)
  • 68 Construction Service and Trading JSC
  • 471 JSC
  • Dong Do Group JSC
Total Investment
Total Investment

VND 6.018 trillion

Vinh Hung Scope of Work
Vinh Hung Scope of Work

Supply and installation of solutions including high-strength steel mesh systems combined with shear connectors, and polymer-based triaxial geogrids for surface erosion control.

Year
Year

2024