“The Van Ninh – Cam Lo Expressway is 65.5 km long and consists of two contract packages, with a total investment of VND 9.9 trillion. The project is a key section of the eastern North – South Expressway corridor, one of the country’s most important transportation arteries.

To ensure traffic safety and structural stability, Vinh Hung implemented a high-strength steel mesh system combined with shear connectors, together with polymer-based triaxial geogrids for surface erosion control. This solution enhances slope stability, prevents rockfall, and ensures safety for road users traveling through the project section.

Vinh Hung was honored with a Certificate of Merit awarded by the Minister of Construction for outstanding achievements during the construction of the Phase 2 North – South Expressway component project, Van Ninh – Cam Lo section, under the “500 Days and Nights of Emulation to Complete 3,000 km of Expressways” campaign. This recognition reflects the company’s continuous dedication on site, extended working shifts, and strong commitment to construction progress, discipline, and quality in support of both the project objectives and national infrastructure development goals.”

Van Ninh – Cam Lo Expressway

Project information

Client
Client

Ho Chi Minh Road Project Management Board

Contractor(s)
Contractor(s)

Truong Thinh Group JSC

Total Investment
Total Investment

VND 9.9 trillion

Vinh Hung Scope of Work
Vinh Hung Scope of Work
  • Supply of bridge bearings, expansion joints, prestressing cables, and prestressing anchorages.
  • Supply and installation of solutions including high-strength steel mesh systems combined with shear connectors, and polymer-based triaxial geogrids for surface erosion control.
Year
Year

2025

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.

Warning: file_exists(): open_basedir restriction in effect. File(action-scheduler-en_US.mo) is not within the allowed path(s): (/www/wwwroot/vinhhungjsc.com/:/tmp/) in /www/wwwroot/vinhhungjsc.com/wp-content/plugins/wpml-string-translation/classes/MO/Hooks/LoadTranslationFile.php on line 82

Warning: file_exists(): open_basedir restriction in effect. File(action-scheduler-en_US.l10n.php) is not within the allowed path(s): (/www/wwwroot/vinhhungjsc.com/:/tmp/) in /www/wwwroot/vinhhungjsc.com/wp-content/plugins/wpml-string-translation/classes/MO/Hooks/LoadTranslationFile.php on line 85