The Dao River Bridge Project has a total investment of VND 1.2 trillion and is being implemented from 2022 to 2025, with the Nam Dinh City People’s Committee serving as the project owner. The bridge connects Song Hao Road (Tran Quang Khai Ward) and Vu Huu Loi Road (Cua Nam Ward). Designed as a cable-stayed bridge, it comprises 16 spans with a total length of 1.6 km, including an 0.8 km river-crossing section and 0.8 km of approach roads. The bridge has a deck width of 20.5 m.

At this project, Vinh Hung was selected to supply 36 saddle units, 69.87 tonnes of stay cables and accessories, and to carry out the finishing works for Piers P8 and P9.

Dao River Extradosed Bridge Project

Project information

Package Name
Package Name

Contract Package: Construction of the Dao River Bridge Connecting Song Hao Road and Vu Huu Loi Road, Nam Dinh City

Contractor(s)
Contractor(s)

Nam Dinh City Construction Investment Project Management Board

Total Investment
Total Investment

VND 1.2 trillion

Vinh Hung Scope of Work
Vinh Hung Scope of Work
  • Supply of materials and execution of stay-cable finishing works.
  • Supply and installation of the saddle system.
Complete Year
Complete Year

2025