Contract Package No. 4: Construction, project: Repair of Gianh Bridge at Km625+500, National Highway 1, Quang Binh Province
Contract Package No. 4: Construction, project: Repair of Gianh Bridge at Km625+500, National Highway 1, Quang Binh Province
Contract Package No. 4: Construction, project: Repair of Gianh Bridge at Km625+500, National Highway 1, Quang Binh Province
Contract Package No. 4: Construction, project: Repair of Gianh Bridge at Km625+500, National Highway 1, Quang Binh Province

Contract Package No. 4: Construction, project: Repair of Gianh Bridge at Km625+500, National Highway 1, Quang Binh Province

Contract package no. 4 under the repair project for Gianh Bridge at Km625+500 on National Highway 1, Quang Binh Province was implemented to rectify structural damages, ensuring safety and maintaining operational capacity on the vital North – South traffic backbone. The project was invested by Project Management Unit 4.

Vinh Hung served as the contractor executing the repair items, which included fixing cracks on the inner surfaces of box girders, replacing expansion joints, repairing the bridge deck overlay and approach roads, alongside tensioning PC cables.

Contract Package No. 4: Construction, project: Repair of Gianh Bridge at Km625+500, National Highway 1, Quang Binh Province

Project information

Client
Client

Project Management Unit 4

Total Investment
Total Investment

Over VND 18.6 billion

Vinh Hung Scope of Work
Vinh Hung Scope of Work
  • Repair cracks on the inner surfaces of box girders
  • Repair and replace expansion joints
  • Repair the bridge deck overlay and approach roads
  • Tension PC cables
Complete Year
Complete Year

2023