Phuoc An Bridge
Phuoc An Bridge
Phuoc An Bridge
Phuoc An Bridge
Phuoc An Bridge
Phuoc An Bridge
Phuoc An Bridge
Phuoc An Bridge
Phuoc An Bridge
Phuoc An Bridge

Phuoc An Bridge

Phuoc An Bridge is a key transport project connecting Phu My Town (Ba Ria – Vung Tau Province) and Nhon Trach District (Dong Nai Province). The project has a total length of 4.3 km, including 3.5 km of main bridge, 47 m of approach road on the route, and 617 m of port connection road. The project is financed by Ba Ria – Vung Tau Province with a total investment of approximately VND 4.9 trillion and commenced construction in June 2023. Vinh Hung serves as the supplier of bridge bearings for installation on the project.

Phuoc An Bridge

Project information

Client
Client

Ba Ria – Vung Tau Regional Transport and Agricultural Project Management Authority

Total Investment
Total Investment

VND 4.9 trillion

Contractor(s)
Contractor(s)

Hoa Binh 479 Joint Stock Company

Vinh Hung Scope of Work
Vinh Hung Scope of Work
  • Supply of bridge bearings.
  • Supply of cable-stayed bridge cable systems and installation works, with a total quantity of up to 387 tonnes.
Year
Year

2025

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.

Warning: file_exists(): open_basedir restriction in effect. File(action-scheduler-en_US.mo) is not within the allowed path(s): (/www/wwwroot/vinhhungjsc.com/:/tmp/) in /www/wwwroot/vinhhungjsc.com/wp-content/plugins/wpml-string-translation/classes/MO/Hooks/LoadTranslationFile.php on line 82

Warning: file_exists(): open_basedir restriction in effect. File(action-scheduler-en_US.l10n.php) is not within the allowed path(s): (/www/wwwroot/vinhhungjsc.com/:/tmp/) in /www/wwwroot/vinhhungjsc.com/wp-content/plugins/wpml-string-translation/classes/MO/Hooks/LoadTranslationFile.php on line 85