Project Management Unit 7
Van Phong – Nha Trang Expressway
The Van Phong – Nha Trang Expressway is 83 km long and commenced construction in December 2022, with a total investment exceeding VND 11.808 trillion. The route begins at Km 285+000 (Dai Lanh Commune) and ends at Km 368+000 (Dien Tho Commune), connecting with the Nha Trang – Cam Lam Expressway.
The expressway plays an important role in reducing traffic volume on National Highway 1 while significantly shortening travel times between localities. In addition, the Van Phong – Nha Trang Expressway serves as a catalyst for regional socio-economic development, creating opportunities for the formation of new urban areas and industrial zones along the corridor, while also contributing to the growth of tourism in northern Khanh Hoa Province.
Project information
Over VND 11.8 trillion
VNCN E&C Investment Construction and Engineering JSC
- Supply of prestressing concrete cables and prestressing anchors.
- Supply and installation of high-tensile steel mesh systems combined with shear connectors and flexible rockfall barriers.”
2023