CAI TU BRIDGE RENOVATION PROJECT
Construction Contractor | Vinh Hung Trading, Consulting, and Construction Joint Stock Company |
Project location | Hau Giang Province |
Total length | 1.326 m |
Investor | VND 6,889,709,000 billion |
Chủ đầu tư | Road Administration Department IV |
Main Contractor | Vinh Hung Trading, Consulting, and Construction Joint Stock Company |
Vinh Hung’s products supplied | Expansion Joints & Bridge Bearings repair and replacement construction |
Description project
Cai Tu Bridge connects Go Quao district (Kien Giang) and Vi Thanh town (Hau Giang). The main bridge length is 514m, the approach road is 812m, and the bridge width is 12m. The bridge was inaugurated in December 2006.
The current status of the bridge is damaged in some categories: bearings, expansion joints, and roads at both ends of the bridge. This deterioration caused traffic insecurity. According to Decision No. 629/QD-CQLDB IV dated April 26, 2021, the Road Administration Department IV assigned Vinh Hung JSC to carry out the repair & replacement work of the bridge bearings and expansion joints, tilting the bridge end slope, and conduct monitoring reports.