BIEN HOA - VUNG TAU HIGHWAY - Vinh Hung JSC

Transportation projects

BIEN HOA - VUNG TAU HIGHWAY

Construction contractor Son Hai Group Company Limited, 479 Hoa Binh Joint Stock Company, 703 Investment and Construction Joint Stock Company
Location The starting point is at Vo Nguyen Giap route (National Highway 1) in Phuoc Tan ward, Bien Hoa city, Dong Nai province and the ending point is Cua Lap intersection in Ward 12, Vung Tau city, Ba Ria - Vung Tau province.
Total length 77,6km
Total investment 17,800 billions dong
Investor
Main Contractor
Vinh Hung’s products supplied to project: Bridge bearings, Mechanically stabilized earth walls (MSE)

Description project

Bien Hoa - Vung Tau Expressway belongs to the Southeast Expressway. When completed, it will be the fastest connection from Dong Nai to Ba Ria - Vung Tau in less than 1 hour. Bien Hoa - Vung Tau Expressway belongs to the Southeast Expressway. When completed, it will be the fastest connection from Dong Nai to Ba Ria - Vung Tau in less than 1 hour.

The Bien Hoa - Vung Tau expressway project phase 1 was approved by the National Assembly for investment in June 2022 with a length of more than 53 km passing through Dong Nai province (34 km) and Ba Ria - Vung Tau (19,000 km). 5 km) including 3 component projects.

Highways connect Ho Chi Minh and the Southern provincesBien Hoa Vung Tau Expressway (Symbol CT 28) is a route with a length of 77.6 km (66km expressway, 2.8km urban route, 8.8km scale route). Designed with Class A expressway standards, speed 100 - 200 km/h with 6 lanes.