VI / EN
DỰ ÁN CAM LÂM - VĨNH HẢO - Vinh Hung JSC

Transportation projects

CAM LAM - VINH HAO EXPRESSWAY

Construction contractor DEOCA GROUP
Location The starting point is at Km29, coinciding with the end point of the Nha Trang - Cam Lam section, the ending point is at Km134, coinciding with the starting point of the Vinh Hao - Phan Thiet section.
Total length 78,5km
Total investment 8.925 billions dong
Investor Deo Ca Group Joint Stock Company - Deo Ca Construction Investment Joint Stock Company - 194 Construction Investment Corporation Joint Stock Company
Main Contractor DEOCA GROUP
Vinh Hung’s products supplied to project: Bridge bearings, Cable system, Cable system and prestressed anchorage system, Bridge bearings, Expasion joint, Mechanically stabilized earth walls (MSE)

Description project

Dự án Cam Lâm - Vĩnh Hảo có hạng mục hầm núi Vung dài 2,2km, quy mô 3 làn xe, bề rộng hầm 14m. Sau khi hoàn thành, đây sẽ là hầm đường bộ lớn thứ 4 cả nước sau hầm Hải Vân, hầm Đèo Cả và hầm Cù Mông.

Trên tuyến ngoài phần đường chính có 26 cầu, 2 nút giao liên thông, 9 cầu vượt trực thông, 45 hầm chui dân sinh, 257 cống ngang. Tuyến cao tốc được đầu tư phân kỳ đầu tư, giai đoạn 1 quy mô 4 làn xe, vận tốc thiết kế 80 km/h. Giai đoạn 2 gồm 6 làn xe, vận tốc thiết kế 100 - 120 km/h.