NATIONAL HIGHWAY 45 - NGHI SON PROJECT
Construction Contractors: | Truong Son Construction Corporation – Thanh Huy Group Joint Stock Company Licogi16 Joint Stock Company – Dinh An Company Limited – 471 Joint Stock Company Central Construction Corporation – Vietnam Construction and Import-Export Joint Stock Corporation (Vinaconex) |
Project Location: | Starting point: Km337+000 (coinciding with the endpoint of the Mai Son – National Highway 45 project in Tan Phuc commune, Nong Cong district) Endpoint: Km380+000 |
Total Length | 43.28 kilometers |
Total Investment | VND 5,534 billion |
Investor: | Ministry of Transport |
Main Contractor: | Truong Son Construction Corporation |
Vinh Hung’s Role: | Supply and installation of prestressed cables, prestressed anchors, bridge bearings, expansion joints, and noise-proof walls. |
Description project
The National Highway 45 – Nghi Son Project is a component of the North–South Expressway, converted from a public-private partnership (PPP) to public investment under a resolution by the National Assembly Standing Committee.
The project runs 43.28 kilometers through Thanh Hoa province, with a total investment of approximately VND 5,534 billion, broken down as follows:
Construction and equipment: VND 3,193.2 billion
Site clearance and resettlement: VND 1,494 billion
Project management, consulting, and other costs: VND 328.8 billion
Contingency (excluding site clearance): VND 518.3 billion
The construction period is approximately 2 years, and the project was completed in 2023.
The project is divided into investment phases:
Phase 1: 4 lanes; 17-meter roadbed; Design speed: 80 km/h
Final Phase: 6 lanes; 32.25-meter roadbed; Design speed: 120 km/h