VI / EN
Van Don - Tien Yen Expressway Project - Vinh Hung JSC

Transportation projects

Van Don - Tien Yen Expressway Project

Construction Contractor Joint venture Licogi 16, - Thang Long JSC, - 75 bridge, Trung Chinh - Thai Yen - 479 Hoa Binh Joint venture
Project location Quang Ninh
Total length 16,8 km
Total investment 3,600 billion VND
Investor Quang Ninh Transport Construction Project management Board
Prime Contractor Joint venture Licogi 16 - Thang Long JSC - 75 Bridge - Trung Chinh - Thai Yen - 478 Hoa Binh Joint venture
Vinh Hung’s products supplied Prestressed cables, expansion joints, High resistance steel mesh against falling rocks

Description project

Van Don - Tien Yen Expressway is designed with a length of 16.08 km, 4 lanes, and a maximum speed of 120 km/h. Total investment is more than 3,600 billion VND from the provincial budget.

The scope of Van Don - Tien Yen expressway is limited as follows: the starting point is at Km71 (in Dai Xuyen, Van Don district, connecting with Ha Long - Van Don highway), and the endpoint is at Km87+080 (in Dong Ngu, Tien Yen district, connecting with Tien Yen - Mong Cai highway).

The Quang Ninh Provincial People's Committee has just approved the plan to select a contractor to implement the Van Don - Tien Yen Expressway Project. The project has a total investment of 3,658.42 billion VND, invested from the provincial budget, directly invited by the Quang Ninh Provincial Traffic Construction Investment Project Management Board as an investor.

The approved plan includes 13 bidding packages. Currently, the Procuring Entity is organizing the selection of contractors to perform one of the two main construction and installation bidding packages of the Project through public bidding, not online.

Van Don - Tien Yen expressway has a length of 16.8 km. Up to now, the Investor has signed contracts for a number of consulting bidding packages. It is expected that the project will be completed synchronously by the end of 2021.