DIEN CHAU - BAI VOT PROJECT
Construction contractor | Hoa Hiep Company Limited, Cienco4 Group Joint Stock Company, Nui Hong Investment Company Limited, Truong Son Construction Corporation, VINA2 Investment and Construction Joint Stock Company. |
Location | North - South expressway project, Dien Chau - Bai Vot section is about 50 km long, passing through 2 provinces of Nghe An (44.4 km) and Ha Tinh (4.9 km) |
Total length | 50 km |
Total investment | 11,157 billions dong |
Investor | Phuc Thanh Hung Investment Company |
Main Contractor | Hoa Hiep Company - 245 - Dai Hiep - Thai Yen, Truong Son Construction Company, Cienco4 Group Joint Stock Company, Vina2 - Licogi16 |
Vinh Hung’s products supplied to project: | Bridge bearings, Cable system, Prestressed anchorage system |
Description project
The Dien Chau – Bai Vot Project is designed with a total of 6 lanes, a 32.25-meter-wide roadbed, and a design speed of 100–120 km/h. In the initial phase, the project will be constructed with 4 lanes, a 17-meter-wide roadbed, and a design speed of 80 km/h.
The project includes a total of 12 bidding packages, comprising: 6 consulting packages; 1 insurance package; 4 construction packages; 1 ITS (Intelligent Transportation Systems) equipment package.