Location The intersection of Thong Nhat Street and Viet Bac Street, Thai Nguyen City.
Total length 395 meters
Total investment VND 260 billion
Investor Thai Nguyen City People Committee Management Board
Main contractor Joint venture of No.3 Production Industrial and Construction JSC, Xuan Phuong Trading and Construction Limited Company, and Ha Thai Railway JSC
Vinh Hung supplies products Waterproof

Description project

The intersection of Thong Nhat road, Viet Bac road and Hanoi – Thai Nguyen railway is an important intersection connecting Thai Nguyen city to Ha Noi – Thai Nguyen expressway. Currently, this is an intersection that traffic lights control and coordinate transportation.

In purpose of addressing the traffic jam in the intersection now and in the future, specially after the second phase of Viet Bac road and the extended North – South route, prioritizing high flow of vehicle in Thong Nhat road, the design solution for the intersection was divided into 2 phases:

Phase 1: Extending Thong Nhat’s intersection corners and building a road crossing the railway, trimming sidewalks for road construction to ensure traffic, moving and undergrounding the technical infrastructure system, constructing a drainage system 2 sides of Thong Nhat Street; Construction of a road that collects on both sides, with 01 lane for motor vehicles and 01 lane for mixed traffic on each side.

Phase 2: Construction of an underpass along Thong Nhat road with a width of 02 lanes for motor vehicles and 02 lanes for mixed traffic; manholes complete construction; pavement return construction