NGUYEN VAN LINH TUNNEL WATERPROOF PROJECT - Vinh Hung JSC

Waterproofing project

NGUYEN VAN LINH TUNNEL WATERPROOF PROJECT

Nhà thầu thi công Thuan An Construction & Trading Joint Stock Company, Thang Long Corporation, Hai Dang Joint Stock Company
Vị trí dự án Ho Chi Minh City
Tổng chiều dài toàn tuyến 456 m
Tổng mức đầu tư 830 billion VND
Chủ đầu tư Project Management Board for investment and construction of traffic works in Ho Chi Minh City
Thầu chính Joint Venture between Thuan An Trading & Construction Development Joint Stock Company, Thang Long Corporation, Hai Dang Joint Stock Company
Vĩnh Hưng cung cấp sản phẩm VINH HUNG supplies and constructs the waterproofing product for HC2 underpass and its joint section.

Description project

Underpass project at the intersection of Nguyen Van Linh - Nguyen Huu Tho (District 7) invested by the project management board for construction of traffic works in Ho Chi Minh City with a total investment of 830 billion VND; in which, construction cost is about 538 billion dongs, the rest is technical infrastructure relocation and contingency cost.

The project of building two new tunnels on Nguyen Van Linh street with the total length of each tunnel branch is 456 m, the cross-section ensures 3 lanes. The closed section of each tunnel is 98 m long; in which there is a closed tunnel that exceeds the metro line 4 with a length of 40 m. In addition, the project also builds a water-pumping station and drainage system for the tunnel, builds a left turn next to the tunnel...

The project's bidding packages have been implemented since April 2020. Until now, the construction of HC2 underpass package has been completed. The section of constructing for the K0T closed tunnel bored cast-in-place pile, moreover some of the open tunnels which are H1T-H6T, H16T-H18T have been accomplished; deploying construction of other open tunnels and pumping stations...