Mai Sơn - 45 Highway Project - Vinh Hung JSC

Domestic Project

Mai Sơn - 45 Highway Project

Construction contractor Xuan Truong construction private construction enterprise - SonHai group LLC Cuong Thing JSC, 319 392 JSC, Dinh An LLC Deo Ca JSC - Hai Thach JSC, - Hoang Long JSC Joint Venture Phuong Thanh Tranconsin - Truong Son Construction company Joint Venture VINACONEX - Trung Nam Joint Venture.
Project construction Ninh Binh - Thanh Hoa
Total length 63,37km
Total investment 12,111 billion VND
Investor Thang Long Project Management Board
Prime constructor Xuan Truong construction private construction enterprise - SonHai group LLC Cuong Thing JSC, 319 392 JSC, Dinh An LLC Deo Ca JSC - Hai Thach JSC, - Hoang Long JSC Joint Venture Phuong Thanh Tranconsin - Truong Son Construction company Joint Venture VINACONEX - Trung Nam Joint Venture.
Vinh Hung JSC supplies commodity Supplies and constructs bridge bearings, expansion joints, constructs of waterproofing of arches, tunnel walls and reinforcement panels

Description project

The North-South highway project from Mai Sơn - to the 45 National highway No.45 has a total length of 63.37km (the section through Ninh Binh province is 14.41km long; the section through Thanh Hoa province is 48.96km long). The expected investment for this project is about 12.111 billion VND using the state budget capital budget. The project started construction of the first bidding package at the end of September 2020, and is expected to complete the entire work in 2022.

The project is invested in phases, phase 1 invests in building 4 restricted lanes, 17m road bed 17m, design speed 80km/h, complete phase is built according to scale of 6 lanes, road bed 32 .25m, design speed 120km/h.