Project Nhon – Ha Noi railway station

Contractor: Joint-venture of Contractors of Hyundai - Ghella (Korea - Italy)
Project location: Ha Noi
Total area
Total Investment
Investor: Hanoi Urban Railway Management Unit
Main contractor Ministry of Transportation
Products supplied by Vinh Hung VHB pot bearing, PC strand, anchorage, expansion joints, waterproofing membrane

Description project

Line 3 (Van Mieu route) is a part of Hanoi Urban Railway network. The route starts at Nhon station in Bac Tu Liem district and ends at Hanoi station in Dong Da district, passing through 8 overhead stations and 4 underground stations with a total length of 12.5 km, of which the overhead section (Nhon –Cau Giay) is 8.5 km long and the underground section (Cau Giay – Hanoi Railway Station) is 4 km long. The route is still under construction

The railway was designed by Systra (France), started construction in 2010. It is expected that the overhead section will be exploited for commerce in April 2021, while the underground section will be done in December 2022. The route would be pink as of the dragon fruit colour. 

Vinh Hung is honored to be selected for waterproofing construction of the tunnel and station of Hanoi urban railway route.