Thanh Tri Bridge - Vinh Hung JSC

Transportation projects

Thanh Tri Bridge

Construction subcontractor Sumitomo Mitsui Co., Ltd, 75 Bridge Company, CIENCO 8
Project location Hanoi city
Total area
Total investment 5,500 billion VND
Investor Thang Long Project Management Unit
Main contractor Sumitomo Mitsui Co., Ltd, 75 Bridge Company, CIENCO 8
Vinh Hung supplies product Post-tensioning cables

Description project

Thanh Tri Bridge is the largest bridge in the project of seven bridges of Hanoi crossing the Red River connecting Hoang Mai District with Long Bien District, starting from the cut off Highway 1A in Phap Van (Hoang Mai) Ha Noi - Hai Phong in Thach Ban, Long Bien, the end point of cutting national highway 5 in Sai Dong (Long Bien).

Thanh Tri bridge has capacity of H30 - XB80 is truck with a tonnage of less than 30 tons as well as crawler with under 80 tons load, the condition of loading to bridge. The main bridge is 3,084 m in length with a total length of more than 12,000 m, 33.10 m in width with 6 lanes (4 lanes), speed of 100 km / h.  Bid price is VND 1,395.46 billion.

Upon completion, Thanh Tri Bridge will contribute to basically solve the traffic jam in Hanoi capital. Thanh Tri Bridge is considered the largest bridge project in Indochina today.