Thanh Tri Bridge
Construction subcontractor | Sumitomo Mitsui Co., Ltd, 75 Bridge Company, CIENCO 8 |
Project location | Hanoi city |
Total area | |
Total investment | 5,500 billion VND |
Investor | Thang Long Project Management Unit |
Main contractor | Sumitomo Mitsui Co., Ltd, 75 Bridge Company, CIENCO 8 |
Vinh Hung supplies product | Post-tensioning cables |
Description project
Thanh Tri Bridge is the largest bridge in the project of seven bridges of Hanoi crossing the Red River connecting Hoang Mai District with Long Bien District, starting from the cut off Highway 1A in Phap Van (Hoang Mai) Ha Noi - Hai Phong in Thach Ban, Long Bien, the end point of cutting national highway 5 in Sai Dong (Long Bien).
Thanh Tri bridge has capacity of H30 - XB80 is truck with a tonnage of less than 30 tons as well as crawler with under 80 tons load, the condition of loading to bridge. The main bridge is 3,084 m in length with a total length of more than 12,000 m, 33.10 m in width with 6 lanes (4 lanes), speed of 100 km / h. Bid price is VND 1,395.46 billion.
Upon completion, Thanh Tri Bridge will contribute to basically solve the traffic jam in Hanoi capital. Thanh Tri Bridge is considered the largest bridge project in Indochina today.