THO TUONG NEW BRIDGE PROJECT
Contractor: | Vinh Hung JSC |
Vị trí dự án | Ha Tinh Province |
Total area: | 4km |
Tổng mức đầu tư | |
Investor: | Ha Tinh Transportation Construction Investment Project Management Board |
Main Contractor: | Vinh Hung JSC |
Products supplied by Vinh Hung | Supply and Construction of Bearing, Expansion joints and PC strands |
Description project
Tho Tuong Investment Construction Project has the total length nearly 4km, in which the length is over 300m, the width is 9m, the connected roads of two ends is nearly 3.7km, and the design meets the standards of a delta grade – III with the road width 9m.
As planned, the Project will be commenced at the beginning quarter 2/2019, completed in quarter 2/2020 with the total investment fund of 215 VND billion from Provincial budget.