Phung Bridge
Construction subcontractor | Transportation Construction Corporation No. 4 |
Project location | Dan Phuong, Hanoi |
Total area | |
Total investment | 316 billion VND |
Investor | PMU2 |
Main contractor | Transportation Construction Corporation No. 4 |
Vinh Hung supplies product | Bridge bearings |
Description project
The project of building Phung bridge crossing Day river at Km23 + 500, National road 32 connecting Phung town, Dan Phuong district to Phuc Tho district is one of the important fanatical routes from Hanoi to the northwestern provinces. This is a substitute for the Phung underground tunnel, which is often flooded, causing traffic jams every time the Red River diverts to the Day River through Van Coc.
The project consists of two parts: bridge and path section. The bridge length is over 887m and the bridge wall is 120m. The bridge consists of 22 Super T spikes, divided into 4 continuous spans, with a width of 15m with 4 lanes running. The bridge is designed permanent with reinforced concrete and reinforced concrete, HL-93 design load, design speed 60km / h.