VI / EN
EX 7 Package Project - Vinh Hung JSC

Transportation projects

EX 7 Package Project

Construction subcontractor
Project location Passing through Thanh Ha and An Lao districts, Hai Duong province
Total area
Total investment Total value of the entire route is 30,000 billion VND
Investor VIDIFI Corporation
Main contractor EX 7 package – GS Engineering and Construction Corp
Vinh Hung supplies and install expansion joints

Description project

EX 7 bidding package is one of 10 packages of Ha Noi - Hai Phong Highway construction project valued at USD 175 million, of which USD 100 million is from Korea. Other loans are provided by local banks.

EX 7 package is 9.3 km in length starting at Km 72 and ending at Km 81 + 300 passing through Thanh Ha district (Hai Duong province) and An Lao district. Apart from the road, this package also includes two large bridges across the rivers namely 965 m Thanh An Bridge and 231 m Ba Ba Bridge, designed in accordance with the highest bridge design standards of Vietnam and the world. The contract was expected to be completed after 34 months from the date of commencement. The EX 7 contractor is the GS Engineering and Construction Group (GS E&C - Korea), specializing in the field of construction refineries and petrochemicals, electric factory, civil and architectural projects, etc.