Dragon Bridge
Construction subcontractor | Mechanical Construction Company No. 1, Bridge Enterprise 17, CIENCO1 |
Project location | Danang City |
Total area | |
Total investment | 1,741 billion VND |
Investor | Danang Department of Transport |
Main contractor | Mechanical Construction Company No. 1, Bridge Enterprise 17, CIENCO1 |
Vinh Hung supplies product | Post-tensioning cables |
Description project
Dragon Bridge, weighing 900 tons, is designed according to the image of a dragon of the Ly dynasty with a total cost of 1700 billion. Dragon Bridge has the length of about 666 meters, the main span is 200 meters long, 37.5 meters wide, has 6 lanes, the pedestrian margin on each side is 2.5 meters wide. This is the seventh bridge and one of the newest bridges on the Han River. It was officially opened on March 29, 2013, the bridge construction cost is nearly 1.5 trillion (US $ 88m).
The bridge was designed by Ammann & Whitney Consulting Engineers with Louis Berger Group. The construction is carried out by the Traffic Engineering Corporation 1. This modern bridge crosses the Han River at the Le Dinh Duong / Bach Dang Roundabout, making it the shortest way from Da Nang International Airport to the Han River. The main road in Da Nang City, and a direct route to My Khe Beach and Non Nuoc Beach on the eastern edge of the city. The bridge was designed and built in the shape of a dragon capable of flushing and spraying the real water. At present, fire spray and water spraying time starts at 21 o'clock on Saturdays, Sundays and major holidays. - Bridge crosses the Han river with a unique design in the shape of a child. Giant dragons that are capable of spraying water, spraying fire are preparing to fly to the sea was honored to be awarded major awards of the Board of Engineering Company of America.