Bach Ho Bridge
Constructors | JSC Railway Works Corporation |
Location | HUe |
Scope | |
Total Invest | 730 billion VND |
Investor | Department of Transportation - Hue Transport |
Main constructor | Railway Works Corporation |
Vĩnh Hưng cung cấp sản phẩm | Expansion joint |
Description project
The bridge was constructed with the name "Bach Ho Bridge Road" (running parallel with Bach Ho Steel Road for train) inaugurated on August 31, 2012.
The bridge is 542.5 m (including the path), 24.5 m wide with four lanes and two pedestrian crossings. The bridge has five beams and a parapet. White Tiger bridge at the intersection with National Highway 1A and Kim Long, the last point connecting Bui Thi Xuan. Along the bridge there are six gazebo so that people and tourists can sit and watch the scenery. Bach Ho Bridge connects the north bank of the Huong River to Da Vien Islet, with a length of 302.1 m.