Da Rang Bridge
Construction subcontractor | Thinh Vuong Company, Licogi 18.6, Thanh Tung Company, Thang Long Bridge No. 7 JSC, CIENCO 510 |
Project location | |
Total area | |
Total investment | More than 340 billion VND |
Investor | Ministry of Transportation |
Main contractor | Thinh Vuong Company, Licogi 18.6, Thanh Tung Company, Thang Long Bridge No. 7 JSC, CIENCO 510 |
Vinh Hung supplies product | Post-tensioning cables, bridge anchorages, bridge bearings, expansion joints |
Description project
Da Rang Bridge Project has a total length of nearly 1.6 km. In particular, the main bridge has a length of nearly 1.2 km permanently designed, cross section of bridge surface width of 10.5m, including 2 vehicle lanes, a divider and a walkway. The implementation period is 12 months. The road section is in accordance with the standards of the main urban streets, with the cross-sectional dimension suitable to the width of the bridge. The project has a total investment of more than VND 340 billion from the surplus capital of Highway 1, Ho Chi Minh Road. The construction and installation contractors are No 18.6 Invesment And Road Bridge Construction Joint Stock Company and Civil Engineering Construction Joint Stock Company No. 510. The supervision consultant contractors are the Transport Engineering Consultant JSC No. 2 and Thang Long Construction Quality Consultant Joint Stock Company. The design consultancy contractor are the Transport Engineering Design Incorporation and VNC Construction Joint Stock Company.