Than Vu Tunnel Project
Than Vu Tunnel Project
Than Vu Tunnel Project
Than Vu Tunnel Project
Than Vu Tunnel Project

Than Vu Tunnel Project

Than Vu Tunnel was considered one of the most challenging and technically complex mountain tunnels on the North – South Expressway. The waterproofing system was installed to prevent groundwater infiltration into the tunnel lining, protect electrical and traffic control m equipment, and enhance the long-term durability of the structure.

The waterproofing system was installed between the shotcrete layer and the final tunnel lining and consisted of two layers: an outer nonwoven geotextile layer and an inner waterproofing membrane.

In July 2024, Vinh Hung completed waterproofing works covering 2.3 km (approximately 65,000 m²) across both left and right tunnel bores.

Than Vu Tunnel Project

Project information

Client
Client

Railway Project Management Board, Ministry of Transport

Contractor(s)
Contractor(s)

Cienco4 Group JSC and Hoa Hiep Co., Ltd.

Total Investment
Total Investment

VND 1.35 trillion

Vinh Hung Scope of Work
Vinh Hung Scope of Work

Supply of waterproofing materials and installation of tunnel waterproofing systems.

Year
Year

2023 – 2024