Client
Project Management Unit 7
The Vinh Hao – Phan Thiet component project, located in Binh Thuan Province, has a total length of 101 km.
Within this project, Vinh Hung implemented slope stablization solutions using high-strength steel mesh systems combined with shear connectors and polymer-based triaxial geogrids for surface erosion control. In addition, flexible rockfall barrier systems were installed at locations with high risks of falling and flying rocks to ensure safety for road users and vehicles traveling through the area.
Project Management Unit 7
Thang Long Corporation – JSC
Nearly VND 11 trillion
2023