Ho Chi Minh Road Project Management Board
Van Ninh – Cam Lo Expressway
The Van Ninh – Cam Lo Expressway is 65.5 km long and consists of two construction packages, with a total investment of VND 9.9 trillion. It forms a critical link within the Eastern North–South Expressway corridor, one of Vietnam’s most important transportation arteries.
The noise barrier works implemented by Vinh Hung commenced in early October 2025 and involved the installation of 13,930 noise barrier panels and 4,428 screw piles, with completion achieved in January 2026. Construction activities were concentrated in areas adjacent to residential neighborhoods, schools, healthcare facilities, and community spaces, helping to mitigate traffic noise impacts generated by vehicles traveling on the expressway.
Project information
Truong Thinh Group JSC
VND 9.9 trillion
- Supply of bridge bearings, expansion joints, prestressing concrete cables, and prestressing anchorages.
- Supply and installation of high-strength steel mesh systems combined with shear connectors; polymer-based triaxial geogrids for surface erosion control; and sound-absorbing noise barriers.
2025