Client
Project Management Unit 7
The Chi Thanh – Van Phong Expressway has a total length of more than 48 km. The route begins at the Chi Thanh Interchange (Tuy An Bac Commune), connecting with the Quy Nhon – Chi Thanh Expressway. Its endpoint is located at the National Highway 1 Interchange (Hoa Xuan Commune), linking to the Deo Ca Tunnel and the Van Phong – Nha Trang Expressway. The project has a total investment of nearly VND 11 trillion and commenced construction in early 2023.
At this project, Vinh Hung supplied bridge bearings, expansion joints, and prestressing concrete cables.
Project Management Unit 7
VND 11 trillion
2023 – 2025