Bung – Van Ninh Expressway
Bung – Van Ninh Expressway
Bung – Van Ninh Expressway
Bung – Van Ninh Expressway
Bung – Van Ninh Expressway
Bung – Van Ninh Expressway

Bung – Van Ninh Expressway

The Bung – Van Ninh Expressway is a component project of the Eastern North – South Expressway network for the 2021 – 2025 period, passing through Quang Binh Province.

The route is approximately 48.8 km long, starting in Cu Nam Commune (formerly Bo Trach District) and ending in Van Ninh Commune (formerly Quang Ninh District), with a total investment exceeding VND 9.3 trillion. Construction commenced in January 2023, technical traffic opening was achieved on April 19, 2025, and the main route officially opened to traffic on April 28, 2025.The expressway serves as a critical link between the Vung Ang – Bung Expressway to the north and the Van Ninh – Cam Lo Expressway to the south, contributing significantly to the completion of the expressway network across the North Central Coast region.

Vinh Hung supplied bridge bearings, expansion joints, prestressing concrete cables, and prestressing anchorages for the project.

Bung – Van Ninh Expressway

Project information

Client
Client

Project Management Unit No. 6

Total Investment
Total Investment

VND 9.3 trillion

Contractor(s)
Contractor(s)
  • Cienco4 Group JSC
  • Trung Chinh Trading and Construction Co., Ltd.
  • Truong Son 28 Branch – Truong Son Construction Corporation
  • DCH – Huy Hoang Investment JSC
  • Construction Works Investment and Installation JSC No. 575
  • Truong Son Construction Investment JSC
Vinh Hung Scope of Work
Vinh Hung Scope of Work

Supply of bridge bearings, expansion joints, prestressing concrete cables, and prestressing anchorages.

Year
Year

2023 – 2025

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.

Warning: file_exists(): open_basedir restriction in effect. File(action-scheduler-en_US.mo) is not within the allowed path(s): (/www/wwwroot/vinhhungjsc.com/:/tmp/) in /www/wwwroot/vinhhungjsc.com/wp-content/plugins/wpml-string-translation/classes/MO/Hooks/LoadTranslationFile.php on line 82

Warning: file_exists(): open_basedir restriction in effect. File(action-scheduler-en_US.l10n.php) is not within the allowed path(s): (/www/wwwroot/vinhhungjsc.com/:/tmp/) in /www/wwwroot/vinhhungjsc.com/wp-content/plugins/wpml-string-translation/classes/MO/Hooks/LoadTranslationFile.php on line 85