VI / EN
Inauguration of the Road Connecting National Highway 19 - Vinh Hung JSC

News

INAUGURATION OF THE ROAD CONNECTING NATIONAL HIGHWAY 19 – BECAMEX VSIP INDUSTRIAL PARK – QUY NHON PORT

29/03/2025 11:10:08
On March 27, Binh Dinh Province inaugurated the road connecting National Highway 19 to Becamex VSIP Binh Dinh Industrial Park and Quy Nhon Port. With a total investment of nearly 1,200 billion VND, the road traverses forests and mountains, marking a major milestone in celebration of 50 years of reconstruction and development in Binh Dinh Province since liberation. For this project, Vinh Hung was responsible for supplying and constructing anti-erosion solutions using a 3-axis double-twisted polymer-coated mesh system. In parallel, Vinh Hung deployed a slope reinforcement and rockfall prevention system, utilizing high-strength steel mesh combined with anchors.

Deputy Prime Minister Nguyen Chi Dung speaks at the inauguration ceremony

Speaking at the ceremony, Deputy Prime Minister Nguyen Chi Dung emphasized that the project not only marks the completion of a modern transport route but also serves as a powerful symbol of Binh Dinh’s 50-year journey of growth and development following liberation.

Mr. Nguyen Tu Cong Hoang, Vice Chairman of the Binh Dinh Provincial People’s Committee, noted that the new route spans approximately 19.5 km, designed according to Grade III plain road standards, with two lanes for motor vehicles and two lanes for rudimentary vehicles. The route passes through An Nhon Town, Tay Son District, and Van Canh District. Along the way, it features seven prestressed reinforced concrete bridges, as well as a modern, synchronized system of drainage, traffic safety, and lighting infrastructure.
The new road reduces travel distance from the intersection of National Highway 19 (Km27+250) and DT.638 (Km120+825) in Nhon Tan Commune, An Nhon Town to the center of the Becamex VSIP Binh Dinh Industrial, Urban and Service Park, shortening it from 31.5 km to 16.5 km.

Beyond shortening travel time, the route plays a strategic role in enhancing transport infrastructure and facilitating trade between Becamex VSIP Binh Dinh and the Central Highlands provinces as well as Quy Nhon Port. It also contributes to ensuring security and defense in the province’s western localities.

At the project, Vinh Hung implemented erosion control solutions using a 3-axis polymer double-twisted steel mesh system, and concurrently deployed a slope reinforcement and rockfall prevention system using high-strength steel mesh and anchoring technology. Construction began in March 2024. As of now, the main package of works has been completed, while remaining supplementary items are being accelerated, with final completion expected by June 2025.