BEN LUC - LONG THANH EXPRESSWAY PROJECT
1 - Investor: Vietnam Expressway Corporation (VEC).
2 - Technical support consultancy: BYM Group cooperating with KEI & Nippon Koei Engineering (Japan).
Ben Luc - Long Thanh links the ring road outside the southern suburb of Ho Chi Minh City as well as being a short part of the North-South expressway in Vietnam. It will link with the Ho Chi Minh City - Vung Tau expressway plan, as part of the GMS (Greater Mekong Subregion) economic corridor route from Bangkok to Phnom Penh, Ho Chi Minh City, and Vung Tau.
Ben Luc - Long Thanh expressway project has a total length of 57.8 km, running through Ben Luc and Can Giuoc districts of Long An province; Binh Chanh, Nha Be, Can Gio districts of Ho Chi Minh City and Nhon Trach District, and Long Thanh of Dong Nai province.
(Picture of Ben Luc - Long Thanh expressway project)
(One of the bridges on the Ben Luc - Long Thanh Expressway)
The expressway will be built according to the Class A expressway standard, with 8 lanes and a design speed of 120km / h.
Consultancy services for Ben Luc - Long Thanh expressway projects include the following five main elements:
Component A: Data collection and survey
Component B: Detailed technical design and cost estimate
Component C: Procurement
Component D: Protection
Electronic components: operations and maintenance
Key features of the project:
1) Length, lanes: 58 km, 4 lanes (2 lanes in the first phase)
2) Intersections: 08 intersections
3) Main bridge: Binh Khanh, Phuoc Khanh (Strands with a total length of 7,576 m)
4) Overpass: Total length of 10,500 m
5) Bridge small: 12 (Total length 7,527 m)
6) Traffic control: ITS system, O/M station