Contract Package No. 01 EC: Survey, Detailed Design, Cost Estimation and Construction of the Grade-separated Interchange at Road No. 2, South Tuy Hoa Urban Area – Nguyen Van Linh Road, Tuy Hoa City, Phu Yen Province
Contract Package No. 01 EC: Survey, Detailed Design, Cost Estimation and Construction of the Grade-separated Interchange at Road No. 2, South Tuy Hoa Urban Area – Nguyen Van Linh Road, Tuy Hoa City, Phu Yen Province
Contract Package No. 01 EC: Survey, Detailed Design, Cost Estimation and Construction of the Grade-separated Interchange at Road No. 2, South Tuy Hoa Urban Area – Nguyen Van Linh Road, Tuy Hoa City, Phu Yen Province

Contract Package No. 01 EC: Survey, Detailed Design, Cost Estimation and Construction of the Grade-separated Interchange at Road No. 2, South Tuy Hoa Urban Area – Nguyen Van Linh Road, Tuy Hoa City, Phu Yen Province

The Grade-separated Interchange at Road No. 2, South Tuy Hoa Urban Area – Nguyen Van Linh Road project commenced construction in June 2019 and was developed by the Phu Yen Province Construction Investment Projects Management Board.

The project consists of a fully grade-separated interchange featuring a railway overpass. The starting point is located on Road No. 2 within the South Tuy Hoa Urban Area, while the endpoint connects to Nguyen Van Linh Road, with two additional ramps linking to Nguyen Tat Thanh Road. The interchange adopts an extradosed cable-stayed bridge design, with bridge pylons inspired by the Mui Dien Lighthouse. The main bridge accommodates four traffic lanes, while the approach bridge provides two traffic lanes, together with drainage systems, sidewalks, curbs, traffic safety facilities and street lighting systems.

Vinh Hung supplied Mechanically Stabilized Earth (MSE) retaining walls for installation at the project.

Contract Package No. 01 EC: Survey, Detailed Design, Cost Estimation and Construction of the Grade-separated Interchange at Road No. 2, South Tuy Hoa Urban Area – Nguyen Van Linh Road, Tuy Hoa City, Phu Yen Province

Project information

Client
Client

Phu Yen Province Construction Investment Projects Management Board

Total Investment
Total Investment

VND 556 billion

Contractor(s)
Contractor(s)
  • 510 Construction JSC
  • An Dong Company
Vinh Hung Scope of Work
Vinh Hung Scope of Work

Supply and provide installation guidance for Mechanically Stabilized Earth (MSE) retaining walls.

Year
Year

2020

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.