On Nut – Lat Krabang Motorway Project, Thailand

On Nut – Lat Krabang Motorway Project, Thailand

The On Nut to Lat Krabang Elevated Road Project has a total length of 3.9 kilometers with 4 traffic lanes. The project begins from the bridge over Nong Kla Canal near Soi Lat Krabang 9/7 and descends towards the end of the project in front of the MWA Suvarnabhumi Branch Office.

The project has a total investment of 1,938.3 million Baht (over 1,322 billion VND) funded by the Bangkok Metropolitan Administration (BMA).

On Nut – Lat Krabang Motorway Project, Thailand

Project information

Client
Client

The Bangkok Metropolitan Administration (BMA)

Contractor(s)
Contractor(s)

Tharawan-Napa Joint Venture

Total Investment
Total Investment

1,938.3 million baht

Total Area
Total Area

3.9km

Vinh Hung Scope of Work
Vinh Hung Scope of Work

Aluminum Comb Expansion Joints (VHF.AL)