Tin tức

Launching a 45-Day-and-Night Competition to Accelerate Construction of Rach Mieu 2 Bridge

14/03/2025 16:59:12

Launching ceremony of the 45-day-and-night emulation campaign to accelerate construction progress at Rach Mieu 2 Bridge

The event took place in a spirited atmosphere as the country looks forward to the upcoming national milestone. The project is now entering its critical phase, with the following major targets:

  • April 30, 2025: Completion and connection of the main cable-stayed span of Rach Mieu 2 Bridge.
  • June 30, 2025: Completion of all five bridges on the route (Xoai Hot Bridge, My Tho Bridge, Tam Son Bridge, Ba Lai Bridge, Rach Mieu 2 Main Bridge, and Song Ma Bridge), along with basic completion of the approach roads.
  • September 2, 2025: Target date for full project completion.

The Rach Mieu 2 Bridge Project is a critical infrastructure initiative that plays a vital role in enhancing connectivity between Tien Giang and Ben Tre provinces, while also alleviating traffic pressure on the existing Rach Mieu Bridge. The emulation campaign reflects the strong commitment of all participating units and serves as a motivational boost for engineers and construction workers striving to hit key milestones.

According to Dong Khoi Newspaper – the official publication of the Ben Tre Provincial Party Committee – the project currently has a total executed contract value of VND 2,670.14 billion, reaching 80.84% completion, exceeding the planned schedule by more than 4%. Notably, the main span of Rach Mieu 2 Bridge is ahead of schedule by over 15%.

Vinh Hung is the contractor supplying and constructing the cable-stayed system for the Rach Mieu 2 Bridge Project

Vinh Hung serves as the contractor for the supply and construction of the cable-stayed system, including 471.8 tons of cable for towers P19 and P20. These towers are designed in an H-shape, built with reinforced and prestressed concrete on bored pile foundations – each with 24 piles, 2 meters in diameter and 80 meters in length.

As of now, Vinh Hung has completed tensioning 96 out of 112 stay cables, using parallel strand systems (PSS) with 31 to 55 strands per bundle.
In response to the launch of the campaign, Vinh Hung has mobilized maximum human and material resources, working overtime to accelerate progress while still ensuring quality, safety, and compliance with labor standards.