{"id":17390,"date":"2026-05-25T10:50:26","date_gmt":"2026-05-25T10:50:26","guid":{"rendered":"https:\/\/vinhhung.webcanhcam.vn\/du-an\/du-an-cau-day-vang-rach-mieu-2\/"},"modified":"2026-06-20T17:37:26","modified_gmt":"2026-06-20T17:37:26","slug":"rach-mieu-2-cable-stayed-bridge-project","status":"publish","type":"project","link":"https:\/\/vinhhungjsc.com\/en\/projects\/in-vietnam\/road-projects\/stay-cable-construction\/rach-mieu-2-cable-stayed-bridge-project\/","title":{"rendered":"Rach Mieu 2 Cable-Stayed Bridge Project"},"content":{"rendered":"<p>The Rach Mieu 2 Bridge and Approach Road Project, connecting Tien Giang and Ben Tre provinces, has a total length of approximately 17.6 km, including nearly 2 km for the main bridge. The bridge is designed with four lanes for motor vehicles, a design speed of 80 km\/h, and two mixed-traffic lanes. The project has a total investment of over VND 6.8 trillion funded by the state budget and commenced construction in March 2022.<\/p>\n<p>The main bridge structure is a two-plane cable-stayed bridge with a prestressed reinforced concrete girder system and a main span arrangement of 120 m + 270 m + 120 m. Under Contract Package XL02, Vinh Hung was selected as the contractor responsible for supplying and installing the stay-cable system, comprising 471.8 tonnes of stay cables, for Towers P19 and P20.<\/p>\n<p>Towers P19 and P20 are designed in an H-shape using reinforced concrete and prestressed reinforced concrete, supported by bored pile foundations. Each tower is founded on 24 piles with a diameter of 2 m and a length of 80 m. The stay-cable system consists of 112 cables arranged in two cable planes and utilizes Parallel Strand System (PSS) cables, with each cable comprising between 31 and 55 strands.<\/p>\n","protected":false},"featured_media":11191,"template":"","project_category":[145,146,204,207],"class_list":["post-17390","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-projects","project_category-road-projects","project_category-in-vietnam","project_category-stay-cable-construction"],"acf":[],"_links":{"self":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/project\/17390","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media\/11191"}],"wp:attachment":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media?parent=17390"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/project_category?post=17390"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}