{"id":13050,"date":"2026-05-25T09:42:39","date_gmt":"2026-05-25T09:42:39","guid":{"rendered":"https:\/\/vinhhung.webcanhcam.vn\/du-an\/du-an-ham-nguyen-van-linh-tp-ho-chi-minh\/"},"modified":"2026-06-20T17:13:13","modified_gmt":"2026-06-20T17:13:13","slug":"nguyen-van-linh-tunnel-project-ho-chi-minh-city","status":"publish","type":"project","link":"https:\/\/vinhhungjsc.com\/en\/projects\/in-vietnam\/road-projects\/waterproofing\/nguyen-van-linh-tunnel-project-ho-chi-minh-city\/","title":{"rendered":"Nguyen Van Linh Tunnel Project, Ho Chi Minh City"},"content":{"rendered":"<p>The Nguyen Van Linh &#8211; Nguyen Huu Tho Interchange Underpass Project in District 7 was developed by the Ho Chi Minh City Transport Works Construction Investment Project Management Board with a total investment of VND 830 billion, including approximately VND 538 billion for construction and the remainder allocated to utility relocation and contingency costs.<\/p>\n<p>The project includes the construction of two new underpasses along Nguyen Van Linh Boulevard, each with a total length of 456 m and a cross-section accommodating three traffic lanes. The enclosed tunnel section of each underpass is 98 m long, including a 40 m section crossing beneath Metro Line 4. The project also includes a pumping station, tunnel drainage system, and left-turn slip roads adjacent to the underpasses.<\/p>\n<p>At this project, Vinh Hung supplied materials and directly carried out waterproofing works.<\/p>\n","protected":false},"featured_media":11061,"template":"","project_category":[145,146,204,205],"class_list":["post-13050","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-projects","project_category-road-projects","project_category-in-vietnam","project_category-waterproofing"],"acf":[],"_links":{"self":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/project\/13050","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media\/11061"}],"wp:attachment":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media?parent=13050"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/project_category?post=13050"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}