{"id":17298,"date":"2013-06-19T00:00:00","date_gmt":"2013-06-19T00:00:00","guid":{"rendered":"https:\/\/vinhhung.webcanhcam.vn\/du-an-duong-cao-toc-ha-noi-hai-phong\/"},"modified":"2026-06-19T16:17:24","modified_gmt":"2026-06-19T16:17:24","slug":"du-an-duong-cao-toc-ha-noi-hai-phong","status":"publish","type":"post","link":"https:\/\/vinhhungjsc.com\/en\/news\/market-news-project-news\/du-an-duong-cao-toc-ha-noi-hai-phong\/","title":{"rendered":"HANOI &#8211; HAI PHONG HIGHWAY PROJECT"},"content":{"rendered":"\n<p><p style=\"text-align: justify;\"><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"D\u1ef1 \u00e1n \u0111\u01b0\u1eddng cao t\u1ed1c H\u00e0 N\u1ed9i - H\u1ea3i Ph\u00f2ng\" caption=\"false\" height=\"440\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/hanoihaiphong.jpg\" style=\"display: block; margin-left: auto; margin-right: auto;\" width=\"500\"\/><\/p>\n<p style=\"text-align: center;\"><em>(Photo of Hanoi &#8211; Hai Phong expressway project)<\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" caption=\"false\" height=\"330\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/hanoihaiphong2.jpg\" style=\"display: block; margin-left: auto; margin-right: auto;\" width=\"500\"\/><\/p>\n<p style=\"text-align: center;\"><em>(Photo Hanoi &#8211; Hai Phong expressway)<\/em><\/p>\n<p style=\"text-align: justify;\"><span>Average cross-section width is 100m, sidewalk width is from 32.5m to 35m with 6 lanes, design speed is 120km\/h, 2 lanes for emergency stop, a separate barrier in the middle, trees on both sides, and some space in some necessary positions. Cars with a design speed of less than 60km\/h and motorcycles are not allowed on this highway. The whole link has 6 interchanges designed at varying levels and 22 overpasses.<\/span><\/p>\n<p style=\"text-align: justify;\">The project is under construction with 6 packages, with a total completion time of 43 months<\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" caption=\"false\" height=\"282\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/hanoihaiphong3.jpg\" style=\"display: block; margin-left: auto; margin-right: auto;\" width=\"315\"\/><\/p>\n<p style=\"text-align: justify;\">A member company of BYM Group will carry out a number of works to meet the customer&#8217;s progress requirements.<\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hanoi &#8211; Hai Phong Expressway Project is the first highway project in Vietnam built in the form of BOT type A according to highway standards. The total length of this route is about 105.5 km, with the starting point on Ring Road 3 &#8211; 1,025 m from Thanh Tri bridge foot (Hanoi), ending point at Dinh Vu dam, Hai Phong city.<\/p>\n","protected":false},"author":1,"featured_media":10991,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[134],"tags":[],"class_list":["post-17298","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/17298","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/comments?post=17298"}],"version-history":[{"count":0,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/17298\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media\/10991"}],"wp:attachment":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media?parent=17298"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/categories?post=17298"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/tags?post=17298"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}