{"id":17238,"date":"2014-09-03T00:00:00","date_gmt":"2014-09-03T00:00:00","guid":{"rendered":"https:\/\/vinhhung.webcanhcam.vn\/hoan-thanh-tuyen-cao-toc-dai-nhat-viet-nam\/"},"modified":"2026-06-19T16:10:33","modified_gmt":"2026-06-19T16:10:33","slug":"hoan-thanh-tuyen-cao-toc-dai-nhat-viet-nam","status":"publish","type":"post","link":"https:\/\/vinhhungjsc.com\/en\/news\/market-news\/hoan-thanh-tuyen-cao-toc-dai-nhat-viet-nam\/","title":{"rendered":"Ho\u00e0n th\u00e0nh tuy\u1ebfn cao t\u1ed1c d\u00e0i nh\u1ea5t Vi\u1ec7t Nam"},"content":{"rendered":"\n<p><p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong><img loading=\"lazy\" decoding=\"async\" caption=\"false\" height=\"330\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/11-scaled.jpg\" style=\"display: block; margin-left: auto; margin-right: auto;\" width=\"450\"\/><\/strong><\/span><\/p>\n<p style=\"text-align: center;\"><em><span style=\"font-family: arial, helvetica, sans-serif;\">M\u1ed9t \u0111o\u1ea1n cao t\u1ed1c N\u1ed9i B\u00e0i &#8211; L\u00e0o Cai \u0111i qua \u0111\u1ecba ph\u1eadn t\u1ec9nh V\u0129nh Ph\u00fac. \u1ea2nh:\u00a0\u0110o\u00e0n Loan.<\/span><\/em><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">Mr. Le Kim Thanh, Deputy General Director of Vietnam Expressway Development Investment Corporation (VEC), representative of investor, said that, in package A4, A5, and the final package more than 70 km, we have advanced nearly 500 billion VND to subcontractors to accelerate construction to the finish line.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">After completing the asphalt pavement, contractors will complete the remaining ancillary items such as railings, trees, drainage ditches, road surface paint, toll station system, etc. In September, the technical traffic clearance and operation will be carried out.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">Noi Bai &#8211; Lao Cai expressway project is divided into 8 construction bidding packages with a total investment (phase 1) of nearly 20,000 billion VND. After more than 5 years of construction, 245 km of the road has been completed.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">This expressway starts at the intersection between National Highway 2 and North Thang Long &#8211; Noi Bai Expressway (Hanoi); The endpoint is at Quang Kim commune (Bat Xat district, Lao Cai province). This is part of the Trans-Asia Road AH 14.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">The completion of all projects will cut down the travel time from Hanoi to Lao Cai by half, to 3.5 hours. Previously, the contractor committed to Transport Minister Mr, Dinh La Thang that by the end of August, the entire route would be completed.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Xu\u00e2n Hoa(<\/strong>http:\/\/vnexpress.net\/)<\/span><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On the afternoon of August 31, the last meters of asphalt carpet on Noi Bai &#8211; Lao Cai highway were completed in Phu Tho and Yen Bai provinces, in accordance with the commitment of the transMinistry of Transport.<\/p>\n","protected":false},"author":1,"featured_media":10113,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[134,136],"tags":[],"class_list":["post-17238","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-market-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/17238","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/comments?post=17238"}],"version-history":[{"count":0,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/17238\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media\/10113"}],"wp:attachment":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media?parent=17238"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/categories?post=17238"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/tags?post=17238"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}