{"id":17122,"date":"2016-06-25T00:00:00","date_gmt":"2016-06-25T00:00:00","guid":{"rendered":"https:\/\/vinhhung.webcanhcam.vn\/vinh-hung-tham-gia-cung-cap-goi-cau-cho-du-an-cau-ghenh-moi\/"},"modified":"2026-06-19T16:01:35","modified_gmt":"2026-06-19T16:01:35","slug":"vinh-hung-tham-gia-cung-cap-goi-cau-cho-du-an-cau-ghenh-moi","status":"publish","type":"post","link":"https:\/\/vinhhungjsc.com\/en\/news\/market-news-project-news\/vinh-hung-tham-gia-cung-cap-goi-cau-cho-du-an-cau-ghenh-moi\/","title":{"rendered":"VINHHUNG SUPPLIES BEARINGS FOR GHENH NEW BRIDGE"},"content":{"rendered":"\n<p><p><span style=\"font-size: 12pt; font-family: arial, helvetica, sans-serif;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"466\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/06\/gheenhf_1.jpg\" style=\"display: block; margin-left: auto; margin-right: auto;\" width=\"729\"\/><\/span><\/p>\n<pre class=\"tw-data-text tw-ta tw-text-medium\" data-placeholder=\"B\u1ea3n d\u1ecbch\" dir=\"ltr\" id=\"tw-target-text\"><span style=\"font-size: 12pt;\"><em><span lang=\"en\" style=\"font-family: arial, helvetica, sans-serif;\" tabindex=\"0\">                                          Ghenh Bridge collapsed after the collision of a barge<\/span><\/em><\/span><\/pre>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt; font-family: arial, helvetica, sans-serif;\">The accident immediately disconnected all the trains from Gai Gon to Ho Chi Minh and vice versa. Thousands of train passengers had to stop at Bien Hoa station to be taken by bus\u00a0for their left journeys. Every day, Saigon Railway Station must arrange more than 100 turns of 45-seat buses to pick up passengers to Bien Hoa station to catch the train and vice versa. The cost of the Railway industry was multiplied by hundreds of million dong per day subsequently.\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt; font-family: arial, helvetica, sans-serif;\">For the important role of this artery bridge, the Prime Minister issued an urgent order to construct a new Ghenh Bridge, the MOT issued an urgent instruction to repair Ghenh Bridge in the shortest time. On March 23, the Railway Project Management Board of Region 3 started construction, the main contractor is Construction Company 3.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt; font-family: arial, helvetica, sans-serif;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"486\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/06\/gheenhf_2.jpg\" width=\"729\"\/><\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-size: 12pt;\"><em><span style=\"font-family: arial, helvetica, sans-serif;\">New Ghenh Bridge is under construction to put into operation<\/span><\/em><\/span><\/p>\n<p><span style=\"font-size: 12pt; font-family: arial, helvetica, sans-serif;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"486\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/06\/gheenhf_3.jpg\" width=\"729\"\/><\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-size: 12pt; font-family: arial, helvetica, sans-serif;\"><em><span lang=\"en\" tabindex=\"0\">Construction units are urgently completing the project<\/span><\/em><\/span><\/p>\n<p><span style=\"font-size: 12pt; font-family: arial, helvetica, sans-serif;\">The new Ghenh Bridge was built as an emergency situation approved by the Prime Minister with a budget of nearly VND 300 billion from the 2016 reserved budget.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt; font-family: arial, helvetica, sans-serif;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"474\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/06\/gheenhf_4.jpg\" width=\"729\"\/><\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-size: 12pt;\"><em><span style=\"font-family: arial, helvetica, sans-serif;\">New Ghenh Bridge is being completed to put into operation<\/span><\/em><\/span><\/p>\n<p><span style=\"font-size: 12pt; font-family: arial, helvetica, sans-serif;\"><em><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"474\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/06\/gheenhf_5.jpg\" width=\"729\"\/><\/em><\/span><\/p>\n<pre class=\"tw-data-text tw-ta tw-text-small\" data-placeholder=\"B\u1ea3n d\u1ecbch\" dir=\"ltr\" id=\"tw-target-text\"><span style=\"font-size: 12pt;\"><em><span lang=\"en\" style=\"font-family: arial, helvetica, sans-serif;\" tabindex=\"0\">                             Bridge bearing products supplied by Vinh Hung under installation<\/span><\/em><\/span><\/pre>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt; font-family: arial, helvetica, sans-serif;\">With the requirement of progress and completed quality, the Contractors of constructing and supplying chosen should be capable units in fields of construction as well as supplying materials to bridge and road industry. Vinh Hung JSC was honored to be chosen to supply bearings products (produced by Mageba Switzerland) for this Project. Along with other contractors, Vinh Hung committed to supplying products of the best quality and in the shortest time in order to endeavor to overcome and building this artery bridge to meet the schedule. The expected time for completion would be June 26, 2016, to connect the North-South railways.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 16px; font-family: arial, helvetica, sans-serif;\"><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 16px; font-family: arial, helvetica, sans-serif;\"><\/span><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 20.03.2016 there was a collision from a barge into Ghenh Bridge on Dong Nai River, at location Km1699+860 causing 02 spans to collapse and traffic paralyzation of the north-south rail service that connects Ho Chi Minh City and Hanoi. Ghenh bridge connected roadway and railway, so when it collapsed the iron bars and railroad tracks fluttered and fell into the river.<\/p>\n","protected":false},"author":1,"featured_media":9726,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[134],"tags":[],"class_list":["post-17122","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/17122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/comments?post=17122"}],"version-history":[{"count":0,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/17122\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media\/9726"}],"wp:attachment":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media?parent=17122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/categories?post=17122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/tags?post=17122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}