{"id":17050,"date":"2018-04-11T12:06:32","date_gmt":"2018-04-11T12:06:32","guid":{"rendered":"https:\/\/vinhhung.webcanhcam.vn\/thong-xe-ham-chui-dien-bien-phu-nguyen-tri-phuong-vuot-tien-do-02-thang-phuc-vu-tuan-le-cap-cao-apec-2017\/"},"modified":"2026-06-19T15:54:22","modified_gmt":"2026-06-19T15:54:22","slug":"thong-xe-ham-chui-dien-bien-phu-nguyen-tri-phuong-vuot-tien-do-02-thang-phuc-vu-tuan-le-cap-cao-apec-2017","status":"publish","type":"post","link":"https:\/\/vinhhungjsc.com\/en\/news\/market-news-project-news\/thong-xe-ham-chui-dien-bien-phu-nguyen-tri-phuong-vuot-tien-do-02-thang-phuc-vu-tuan-le-cap-cao-apec-2017\/","title":{"rendered":"Gaining access to Dien Bien Phu &#8211; Nguyen Tri Phuong tunnel completed over the progress 02 months for the event APEC 2017"},"content":{"rendered":"\n<p><p style=\"text-align: justify;\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">On 11.01.2017, the underground\u00a0tunnel Dien Bien Phu &#8211; Nguyen Tri Phuong (Da Nang city) is officially announced to open for traffic. The\u00a0entire construction line length\u00a0is 409m, including the 80m of the closed bypass,\u00a0180m\u00a0of the opening\u00a0bypass and\u00a0149m for the\u00a0approaching\u00a0road. <\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">Construction of Dien Bien Phu &#8211; Nguyen Tri Phuong intersection, started on 12\/31\/2016 with a contract value of nearly VND120 billion under the Danang city Sustainable Development Project (using capital source loan from the World Bank)<strong>. Vinh Hung Trading, Consulting and Construction JSC<\/strong> is honored to be responsible for the implementation of waterproofing system of the project. According to the plan, the work will be completed by the end of 2017 but with the requirement to quickly progress to meet the APEC 2017 Summit, the project has completed its requirements over the progress<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"450\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/cat_bang_kt.jpg\" width=\"800\"\/><\/span><\/p>\n<p style=\"text-align: justify;\"><em>Technical opening ceremony<\/em><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"533\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/hinh_anh_ham_chui_truoc_gio_thong_xe.jpg\" width=\"800\"\/><\/span><\/p>\n<p style=\"text-align: justify;\"><em>The\u00a0tunnel before opening ceremony<\/em><\/p>\n<p style=\"text-align: justify;\">To achieve the results and achievements, the team of waterproofing workers have made unremitting efforts, eight construction areas are 24\/24 hours to ensure that the construction is carried out continuously, without interruption. In addition, in order to keep up with progress, the workers covered canvas: ate, slept at the site, even in the harsh weather.<\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"684\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/anh_em_lao_dong_1.jpg\" width=\"800\"\/><\/p>\n<p style=\"text-align: justify;\"><em>The staffs\u00a0were working hard on site<\/em><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">On behalf of the city&#8217;s leaders, Huynh Duc Tho, Chairman of Danang People&#8217;s Committee, applauded the efforts of workers who worked on the project during the last 10 months to complete the project on time. This most significant thing is: this is one of the important projects and it was completed sooner nearly 2 months than initial schedule.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"600\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/chu_tich_thuong_tien_do.jpg\" width=\"800\"\/><\/span><\/p>\n<p style=\"text-align: justify;\"><em><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">Mr. <span style=\"font-size: 10pt;\"><span style=\"font-family: arial,helvetica,sans-serif;\"><span style=\"text-align: left; color: #212121; text-transform: none; text-indent: 0px; letter-spacing: normal; font-family: arial,sans-serif; font-weight: 400; word-spacing: 0px; display: inline !important; white-space: pre-wrap; orphans: 2; widows: 2; float: none; background-color: #ffffff;\">Huynh Duc Tho<\/span><\/span><\/span>&#8211; Chairman of Danang People&#8217;s Committee\u00a0<\/span><\/em><span style=\"font-size: 10pt;\"><em><span style=\"font-family: arial,helvetica,sans-serif;\"><span style=\"text-align: left; color: #212121; text-transform: none; text-indent: 0px; letter-spacing: normal; font-family: arial,sans-serif; font-weight: 400; word-spacing: 0px; display: inline !important; white-space: pre-wrap; orphans: 2; widows: 2; float: none; background-color: #ffffff;\"> awarded 200 million VND to the construction unit<\/span><\/span><\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\"><em><\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0Vinhhung media<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\"><em><\/em><\/span><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 11.01.2017, the underground tunnel Dien Bien Phu &#8211; Nguyen Tri Phuong (Da Nang city) is officially announced to open for traffic.<\/p>\n","protected":false},"author":1,"featured_media":10427,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[134],"tags":[],"class_list":["post-17050","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/17050","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/comments?post=17050"}],"version-history":[{"count":0,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/17050\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media\/10427"}],"wp:attachment":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media?parent=17050"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/categories?post=17050"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/tags?post=17050"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}