{"id":16957,"date":"2019-08-06T11:27:17","date_gmt":"2019-08-06T11:27:17","guid":{"rendered":"https:\/\/vinhhung.webcanhcam.vn\/thao-do-cau-tho-tuong-bao-dam-nguyen-ven-de-tai-su-dung\/"},"modified":"2026-06-19T15:47:40","modified_gmt":"2026-06-19T15:47:40","slug":"thao-do-cau-tho-tuong-bao-dam-nguyen-ven-de-tai-su-dung","status":"publish","type":"post","link":"https:\/\/vinhhungjsc.com\/en\/news\/project-news\/thao-do-cau-tho-tuong-bao-dam-nguyen-ven-de-tai-su-dung\/","title":{"rendered":"DISMANTLING THO TUONG BRIDGE, ENSURING THE CONDITIONS FOR RE-USAGE"},"content":{"rendered":"\n<p><p><span style=\"font-family: arial, helvetica, sans-serif;\"><em><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"533\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/tho_tuong_1.jpg\" width=\"800\"\/><\/em><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><em>Tho Tuong bridge is officially dismantled on July 31st,2019 <\/em><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><em>and expectedly finished on October 30th, 2019<\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">Initially, the construction unit will take apart 490 concrete desk slabs from both handrails for pedestrians and rudimentary vehicles, then dismantle the entire bridge frame assembled by steel frame and demolish the concrete surface and bridge girder, piers finally<\/span>.<\/p>\n<p style=\"text-align: justify;\"><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"533\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/tho_tuong_2.jpg\" width=\"800\"\/><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><em>Being installed from a railway bridge, dismantling must be implemented manually, faces difficulties and takes a lot of time <\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">Engineer <strong>Le Khanh Toan<\/strong> \u2013 The Commander in charge of dismantling the work said: the Tho Tuong bridge is utilized from a railway bridge, the structure is mainly installed by iron and steel. So, dismantling must be implemented manually, not by machines. Moreover, most of the old bridge materials are still in good condition which can be re-fabricated new bridges crossing streams and springs. This<span>\u00a0job <\/span>must be carefully carried out to ensure the conditions for re-usage.<\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"font-family: arial, helvetica, sans-serif;\">\u00a0<\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"533\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/tho_tuong_3.jpg\" width=\"800\"\/><\/span><\/p>\n<p style=\"text-align: justify;\"><em><span style=\"font-family: arial, helvetica, sans-serif;\">Concrete desk slabs at both handrails for pedestrians and rudimentary vehicles are removed and gathered to hand over to the Department of Transportation.<\/span><\/em><\/p>\n<p style=\"text-align: justify;\"><em><span style=\"font-family: arial, helvetica, sans-serif;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"533\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/tho_tuong_4.jpg\" width=\"800\"\/><\/span><\/em><\/p>\n<p><em>&#8230;most of the concrete desk slabs are still in solid and usable condition<\/em><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">Engineer <strong>Nguyen Anh Van<\/strong> from PMU of Ha Tinh Transportation Construction Project said, &#8220;PMU coordinate to supervise dismantling to ensure working safety as well as the intact structure of bridge. After dismantling, the finished parts will be arranged in orders and\u00a0 gathered to hand over to the Department of Transportation for management.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"533\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/tho_tuong_5.jpg\" width=\"800\"\/><\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"font-family: arial, helvetica, sans-serif;\">\u00a0<\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><em>&#8230; and loaded to the crane carefully<\/em><\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><em><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"533\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/tho_tuong_6.jpg\" width=\"800\"\/><\/em><\/span><\/p>\n<p style=\"text-align: left;\"><em style=\"font-family: arial, helvetica, sans-serif;\">&#8230;.and were moved to the gathering yard\u00a0<\/em><br\/><span style=\"font-family: arial, helvetica, sans-serif;\"><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">Previously, on July 29th, PMU, contractor were in coordination with the local authority to carry out dividing traffic flows passing this area that pedestrians and rudimental vehicles were allowed to go towards Thuong market railway bridge, 220m far from Tho Tuong bridge at the downstream side.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"533\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/tho_tuong_7.jpg\" width=\"800\"\/><\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><em><span>Safeguards of full day time are mobilized to ensure traffic safety<\/span><\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">The adequate traffic signs are put at the direction to Linh Cam bridge 2, about 5km from the old Tho Tuong bridge from the upstream side for motor vehicles (cars, machinery and motorbikes). At the same time, safeguards of full day time are mobilized from both ends of the bridge to ensure traffic safety and prohibit people and vehicles from crossing the bridge while the work is going on.\u00a0<\/span><\/p>\n<p style=\"text-align: left;\"><em><span style=\"font-family: arial, helvetica, sans-serif;\"><\/span><\/em><\/p>\n<p style=\"text-align: left;\"><em><span style=\"font-family: arial, helvetica, sans-serif;\">According to Ha Tinh press.\u00a0<\/span><\/em><\/p>\n<p style=\"text-align: left;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><\/span><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the morning of July 31, Ha Tinh Project Management Unit of Transport Construction worked together with Vinh Hung Trading, Consulting and Construction Joint Stock Company (Contractor), started dismantling the old Tho Tuong Bridge so that the new one will be built instead. The bridge will be dismantled within 3 months (July 31 to October 30, 2019).<\/p>\n","protected":false},"author":1,"featured_media":10295,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[134,135],"tags":[],"class_list":["post-16957","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/16957","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/comments?post=16957"}],"version-history":[{"count":0,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/16957\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media\/10295"}],"wp:attachment":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media?parent=16957"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/categories?post=16957"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/tags?post=16957"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}