{"id":16744,"date":"2022-10-05T10:28:25","date_gmt":"2022-10-05T10:28:25","guid":{"rendered":"https:\/\/vinhhung.webcanhcam.vn\/chinh-thuc-thong-xe-ham-chui-le-van-luong\/"},"modified":"2026-06-19T15:32:24","modified_gmt":"2026-06-19T15:32:24","slug":"chinh-thuc-thong-xe-ham-chui-le-van-luong","status":"publish","type":"post","link":"https:\/\/vinhhungjsc.com\/en\/news\/project-news\/chinh-thuc-thong-xe-ham-chui-le-van-luong\/","title":{"rendered":"LE VAN LUONG UNDERGROUND TUNNEL OPENNED TO TRAFFIC"},"content":{"rendered":"\n<p><p><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"656\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/06\/khanh_thanh_lvl_11.jpg\" width=\"984\"\/><\/p>\n<p>7am October 5, the opening ceremony of Le Van Luong underground tunnel was held at the open tunnel area in To Huu street. The event was held to celebrate the 68th anniversary of Hanoi\u2019s Liberation Day (October 10, 1954 &#8211; October 10, 2022)<\/p>\n<p class=\"Normal\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"656\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/khanh_thanh_lvl_12.jpg\" width=\"984\"\/><\/p>\n<p style=\"text-align: center;\"><em>Politburo member and leaders cut the ribbon to inaugurate the project<\/em><\/p>\n<p>Le Van Luong underground tunnel was started construction in October 2020. The construction contractor was joint venture of Cienco 4 Corporation JSC \u2013 Fecon JSC \u2013 Vinh Hung JSC.<\/p>\n<p>The 475m tunnel, the fourth of its kind in the city, is located at the intersection of Le Van Luong, Khuat Duy Tien and To Huu streets. Before that, Kim Lien \u2013 Xa Dan underground tunnel was inaugurated in 2009, connecting Tran Khat Chan street and Kim Lien street, Xa Dan belonging to Ring Road no.1. The underground tunnel Trung Hoa connecting Tran Duy Hung street with Thang Long avenue and the underground tunnel Thanh Xuan Intersection of Nguyen Trai Street and Ring Road no.3 were both inaugurated in 2016.<\/p>\n<p>Participating in the inauguration, Vinh Hung Trading, Consulting and Construction JSC honored to be contractor for the waterproof section of the project.<\/p>\n<p class=\"Normal\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"750\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/khanh_thanh_lvl_2.jpg\" width=\"1000\"\/><\/p>\n<p style=\"text-align: center;\"><em>Representative of Vinh Hung Board of Directors and Project Management at the inauguration<\/em><\/p>\n<p class=\"Normal\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"738\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/khanh_thanh_lvl15.jpg\" width=\"984\"\/><\/p>\n<p>The Le Van Luong tunnel was opened to traffic right after the inauguration, transportation easily passed through the tunnel<\/p>\n<p class=\"Normal\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"631\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/khanh_thanh_lvl_16.jpg\" width=\"1000\"\/><\/p>\n<p>After opening to traffic, this intersection has a total of 10 lanes instead of 8 lanes as current, in the direction Le Van Luong street \u2013 To Huu street and vice versa.<\/p>\n<p class=\"Normal\"><span><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"683\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/khanh_thanh_lvl_13.jpg\" width=\"1024\"\/><\/span><\/p>\n<p>According to information from a representative of the Hanoi Traffic Construction Investment Project Management Board, under the direction of the city, the contractor has accelerated the construction progress, soon solved the traffic jam and put the underground tunnel, completed the project earlier than expected on October 5.<\/p>\n<p>Le Van Luong &#8211; Ring Road No. 3 underground tunnel is one of the city\u2019s key transport works.\u00a0The tunnel is hoped to reduce traffic jam at the intersection in the capital.<\/p>\n<p class=\"Normal\"><span><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"642\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/khanh_thanh_lvl_10.jpg\" width=\"962\"\/><\/span><\/p>\n<p>Le Van Luong &#8211; Ring Road No. 3 underground tunnel is one of the city\u2019s key transport works.\u00a0The tunnel is hoped to reduce traffic jam at the intersection in the capital.<\/p>\n<p>Source: Dan Tri<\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the morning October 5, the Le Van Luong \u2013 Ring Road No. 3 underground tunnel officially opened to traffic. The project is expected to address traffic congestion in Le Van Luong \u2013 To Huu \u2013 Ring Road No. 3. Vinh Hung Trading, Consulting and Construction honored to be contractor for the waterproof section of the project.<\/p>\n","protected":false},"author":1,"featured_media":9926,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[134,135],"tags":[],"class_list":["post-16744","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/16744","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/comments?post=16744"}],"version-history":[{"count":0,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/16744\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media\/9926"}],"wp:attachment":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media?parent=16744"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/categories?post=16744"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/tags?post=16744"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}