{"id":16534,"date":"2025-04-25T11:41:17","date_gmt":"2025-04-25T11:41:17","guid":{"rendered":"https:\/\/vinhhung.webcanhcam.vn\/du-an-nut-giao-nghin-ty-tai-tp-ho-chi-minh-chinh-thuc-thong-xe\/"},"modified":"2026-06-19T15:16:42","modified_gmt":"2026-06-19T15:16:42","slug":"du-an-nut-giao-nghin-ty-tai-tp-ho-chi-minh-chinh-thuc-thong-xe","status":"publish","type":"post","link":"https:\/\/vinhhungjsc.com\/en\/news\/project-news\/du-an-nut-giao-nghin-ty-tai-tp-ho-chi-minh-chinh-thuc-thong-xe\/","title":{"rendered":"The &#8220;Trillion-Dollar Intersection&#8221; Project in Ho Chi Minh City Officially Opens to Traffic"},"content":{"rendered":"\n<p><p style=\"text-align: center;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"496\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/phoi_canh.jpg\" width=\"900\"\/><\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><em>\u00a0Rendering of the An Phu project \u2013 a vital traffic intersection at Ho Chi Minh City\u2019s eastern gateway<\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">Construction of the An Phu traffic intersection in Thu Duc City\u2014considered the most critical and largest intersection in Ho Chi Minh City\u2014began at the end of 2022. The project has a total investment of over 3,400 billion VND and features a three-level design: an underpass, ground-level roads, and an overpass. Notably, construction of the HC1 tunnel began urgently in November 2023, overcoming numerous challenges related to site conditions, technical complexity, and weather.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">The project is managed by the Ho Chi Minh City Traffic Construction Investment Project Management Board. Vinh Hung\u2019s role as a special subcontractor included both supplying materials and executing the entire waterproofing scope for the tunnel.<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"534\" src=\"https:\/\/vinhhung.webcanhcam.vn\/wp-content\/uploads\/2026\/05\/z5380912538523_35703e6efb40dbe996c87759bea2fadc.jpg\" width=\"900\"\/><\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-family: arial, helvetica, sans-serif;\">Vinh Hung supplies materials and constructs the waterproofing system for the An Phu Tunnel<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">Waterproofing plays a crucial role in the An Phu Tunnel project, protecting the structure from water intrusion through the bottom slab, walls, and roof of the tunnel. This not only extends the lifespan of the project but also enhances its durability and aesthetics.Waterproofing plays a crucial role in the An Phu Tunnel project, protecting the structure from water intrusion through the bottom slab, walls, and roof of the tunnel. This not only extends the lifespan of the project but also enhances its durability and aesthetics.<\/span><br\/><span style=\"font-family: arial, helvetica, sans-serif;\">\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">The waterproofing system includes a 1.7 mm thick TPO-based membrane wrapped around the bottom slab, tunnel walls, and roof. It is combined with waterstopping tape, expanding rubber, joint sealants, and reinforcement panels at critical points such as expansion and construction joints\u2014creating a fully sealed system to prevent groundwater infiltration.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">With strong technical capacity and extensive experience in waterproofing for urban tunnels in Hanoi, Da Nang, and Ho Chi Minh City, Vinh Hung executed the project with great speed and dedication. Embracing the spirit of \u201covercoming sun and rain,\u201d the team worked in \u201cthree shifts, four teams\u201d to ensure timely completion, meeting the investor\u2019s schedule requirements.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">This is the first completed component of the An Phu three-level intersection project. It directly connects the Ho Chi Minh City \u2013 Long Thanh \u2013 Dau Giay Expressway to Mai Chi Tho Street, enabling vehicles traveling from Dong Nai to the city center to bypass traditional congestion points such as Nguyen Thi Dinh and Dong Van Cong.<\/span><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The An Phu Tunnel Project (Thu Duc City, Ho Chi Minh City) was officially put into operation on April 29, marking a significant milestone in the effort to reduce traffic congestion in the eastern part of the city. The event also commemorates the 50th anniversary of the Liberation of the South and National Reunification (April 30, 1975 \u2013 April 30, 2025). In this project, Vinh Hung played a key role as a specialized subcontractor, supplying materials and executing the waterproofing work for the An Phu Tunnel.<\/p>\n","protected":false},"author":1,"featured_media":9398,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[134,135],"tags":[],"class_list":["post-16534","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/16534","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/comments?post=16534"}],"version-history":[{"count":0,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/posts\/16534\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media\/9398"}],"wp:attachment":[{"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/media?parent=16534"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/categories?post=16534"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vinhhungjsc.com\/en\/wp-json\/wp\/v2\/tags?post=16534"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}