Transportation projects

Ring Road 3

Construction subcontractor CIENCO 1, Sumitomo Mitsui Construction, Construction Company 1, Bridge Construction One Member Limited Company 75, Transportation Engineering Construction Corporation 8
Project location Hanoi
Total area
Total investment 7,748 billion VND
Investor Thang Long Project Management Board
Main contractor CIENCO 1, Sumitomo Mitsui Construction, Construction Company 1, Bridge Construction One Member Limited Company 75, Transportation Engineering Construction Corporation 8
Vinh Hung supplies product Post-tensioning cables, bridge anchorages, bridge bearings, expansion joints

Description project

Hanoi Ring Road 3 is an important traffic road of Hanoi, about 65 km long, passing through districts Dong Anh, Northern Tu Liem, Southern Tu Liem, Cau Giay, Thanh Xuan, Thanh Tri, Hoang Mai, Long Bien, Gia Lam. Ring Road 3 is actually a combination of many existing roads, including the following roads: Vo Van Kiet, Pham Van Dong, Pham Hung, Khuat Duy Tien, Nguyen Xien, Nghiem Xuan Yem, Phap Van Viaduct, Thanh Tri Bridge, National Highway 1A from Thanh Tri to Ninh Hiep. The section from Ninh Hiep to Bac Thang Long - Noi Bai Highway, including many small urban roads, passes through the control points of Viet Hung - Dong Anh - Tien Duong - Nam Hong (south of the North Ring railway). As planned for the first phase, the Noi Bai - Mai Dich - Thanh Xuan - Phap Van - Thanh Tri bridge is formed by two-sided urban roads combined with the urban middle road. In Phase II, 8,912 km will be made up of 385 meters of road and 8,527 meters of viaduct, including 4 expressways, 2 emergency stops. The elevated highway section from the south of Thanh Tri bridge to the end of Pham Van Dong road (next to Hanoi National University) has been completed and in the 2016-2020 period, 5.2 km of highway will be continued to be constructed from Mai Dich to Thang Long bridge. The Ring Road 3 was extended from Mai Dich - Thang Long bridge (Pham Van Dong road) and it is planned to open the bridge section of Thang Long - Nam Hong - Viet Hung. As of 2010, the extension of the Ring Road 3 from Thanh Tri to Mai Dich (ie Phap Van, Nghiem Xuan Yem, Nguyen Xien, Khuat Duy Tien, Pham Hung) has been finished. On Ring Road 3 route, there are 3 big bridges: Thang Long Bridge, Thanh Tri Bridge and Phu Dong Bridge. Ring Road 3 intersects with Highway 5 in Sai Dong, Thang Long Highway at Tran Duy Hung crossroad.